Tuesday, October 27, 2009

Just quickly...

Good thing I'm not participating in Blogtoberfest! otherwise I would be doing very poorly. I have enjoyed reading people's updates though!

Drove into work today for a change (haven't done that since we moved to Bray Park!) and stopped in at Funky Fabrix - something that I had been meaning to do since I was chatting with Kelly a few weeks ago about the lack of dresses that fit me in the bosom. I didn't purchase any fabric, but did come away with Amy Butler's Mini Dress/Tunic pattern. Looking forward to eventually having a sewing machine (how many days is it until Christmas!?) and being able to sink my teeth into sewing from a pattern, and having awesome handmade clothes! Not that I don't already have awesome handmade clothes... ;)

I have a new project that I'm working on too - the Honeybee Cardigan! I've been working on this for almost two weeks now, and it's looking great - although the yarn that I've chosen (Malabrigo Sock in Archangel) certainly has a bit of an identity crisis - magenta one minute, dark purple the next!



This is where I was up to yesterday - eight inches down, only seven more to go ! I bought some small circular needles tonight so I can start doing the sleeves - thank goodness Addis come in 30cm circulars! You knit the sleeves from the elbow up, and then attach them into the body (which is what I'm working on at the moment). I'm glad that I saw a student who was taking Technical Support classes with work doing a top similar in construction, otherwise I think I would have been a bit lost when it got to that section - I'm not sure if I'm glazing over that part of the pattern, but I still haven't found the part where it says to transfer them. Go figure! :D

Was also looking through Made It tonight, and found some super cute skirts at Lilli Pilli Lane. This only strengthens my urge/need/want/lust to sew! Although then I will be starting a fabric stash... this cannot be good.

although by the sounds of it, I may be getting downstairs as my playroom...

Righto. VERY much past my bedtime now. Up early for work in the morning, and I still haven't had a shower. :D

Thursday, October 8, 2009

Hitting Gold!

From skein to shirt in 10 days! :D

Rusted Root by Zephyr Style.



Materials: Cotton Fleece in Gold Dust, 4.00mm Addi circulars for body, 3.50mm for ribbing
Used: 2.98 skeins - 298g! :D
Size: Large
Mods:
Main mod obviously was dropping the neckline! To do this, I cast on
for knitting flat:
1 (front), pm, 13 (sleeve) pm 20 (back) pdm when knitting in the round 20 (back pm 13 (sleeve) pm 1 (front). Then I did raglan increases Kf&B until front measures 4” from cast on. Then I cast on the required stitches for the front, minus two for the two I cast on at the start. It really wasn't too difficult! :D And I only did seven rounds of ribbing at the bottom, otherwise I would have run out of yarn.
Started: 22nd September, 2009
Finished: 2nd October 2009
Made For: Me




I think I will make another one for Caitlin for Christmas. I really need to start looking at Christmas presents and what I need to make and what I need to buy.